Air Force Issues Flight Release For Eglin AFB F-35A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 02, 2012

Air Force Issues Flight Release For Eglin AFB F-35A

Aircraft Ready To Begin Initial Operations After Airworthiness Board Approval

Officials at the Aeronautical Systems Center a Wright Patterson AFB in Ohio have issued a Military Flight Release that will allow the F-35A Lightning II fighter to begin initial operations at Eglin Air Force Base, FL. This decision was reached after an airworthiness board conducted an assessment that evaluated potential risks and the corresponding mitigation actions to conduct unmonitored flights.

USAF Image

Flying the Air Force variant of the joint strike fighter will increase pilot and maintainer familiarity with the aircraft, exercise the logistics infrastructure and continue to develop aircraft maturity. These initial F-35A flights will be limited, scripted, conducted within the restrictions and stipulations of the MFR and flown by qualified pilots, officials said.
 
"The Air Force, Joint Strike Fighter Program Office and other stakeholders have painstakingly followed established risk acceptance and mitigation processes to ensure the F-35A is ready," said Gen. Donald Hoffman, the commander of Air Force Materiel Command, the parent organization of ASC. "This is an important step for the F-35A and we are confident the team has diligently balanced the scope of initial operations with system maturity."

The assessment was conducted with airworthiness engineering subject matter experts within ASC and was fully coordinated with the F-35 Joint Strike Fighter Program Office, Air Education and Training Command and other expert participants. The Air Force is confident the aircraft is ready to fly in a safe and efficient manner, Hoffman said.

FMI: www.af.mil

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC