Two H225Ms Delivered To Brazilian Armed Forces | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, May 29, 2017

Two H225Ms Delivered To Brazilian Armed Forces

Two Additional Aircraft To Be Delivered Later This Year

In the last few weeks Helibras has delivered two H225Ms to the Brazilian Armed Forces. Two additional aircraft will be delivered this year.

The first helicopter – destined to the Army - has been delivered in the full operational configuration, including specially designed mission systems unique to the Army. Based in Taubaté and operated by the 1º BAvEx, this is the ninth H225M to integrate the Brazilian Army’s fleet.

The second – in full operational configuration for Combat SAR – has been delivered to the Air Force and will be based in Río de Janeiro to be operated by the 3º/8º GAV. This delivery brings the Air Force’s H225M fleet to 12 helicopters.

In all, the company is expected to deliver four H225Ms to the Armed Forces in 2017. "We are on track with the delivery schedule and we are confident, thanks to our highly skilled teams that we will deliver on time to the three Armed Forces ", said Richard Marelli, President of Helibras.

Brazil’s H225Ms are assembled at Helibras Itajuba’s plant. With the aim of achieving a significant level of national content Helibras has developed a local supply chain, which currently includes 37 Brazilian companies. Helibras also has a state of the art engineering centre which develops in-country specific mission systems for Brazil’s Armed Forces’ H225M.

With these two H225M deliveries, the Armed Forces’ fleet totals 28 H225Ms: 12 for the Air Force, 9 for the Army and 7 for the Navy. Deliveries for the remaining helicopters foreseen by the contract - a total of 50 H225M - are expected to be completed by 2022.

Other important H225M milestones this year include the qualification of the H225M naval combat version.

(Image provided with Airbus Helicopters news release)

FMI: www.airbushelicotpers.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC