USAF Evaluation Team Mulls Over KC-X Choices | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Most Recent Daily Airborne

Airborne On ANN

Airborne On YouTube/Hi-Def/Mac Friendly

Monday

Airborne 01.26.15

Airborne 01.26.15

Tuesday

Airborne 01.27.15

Airborne 01.27.15

Wednesday

Airborne 01.21.15

Airborne 01.21.15

Thursday

Airborne 01.22.15

Airborne 01.22.15

Friday

Airborne 01.23.15

Airborne 01.23.15

 

Wed, May 09, 2007

USAF Evaluation Team Mulls Over KC-X Choices

Team Sequestered At Wright-Patterson AFB

The US Air Force tells ANN the jury is still out on which aircraft will win a lucrative contract for a new tanker. The Air Force source selection evaluation team is hard at work pouring over industry proposals for the KC-X program, the replacement for the Air Force's aging KC-135 strategic refueling aircraft.

The evaluation team, comprised of a broad spectrum of acquisition and operational professionals, is currently sequestered at Wright-Patterson Air Force Base, OH... carefully evaluating the proposals submitted in April 2007. As ANN reported, a team led by Northrop Grumman and EADS submitted a tanker variant of the Airbus A330 commercial airliner; Boeing submitted a variant of its own 767 for bid.

"I have an Air Force-wide, hand-picked team of more than 150 experts reviewing every aspect of these proposals," said Mr. Terry Kasten, Director, 653rd Aeronautical Systems Squadron (AESS), WPAFB. "When the dust settles, we'll have spent many tens of thousands of man-hours scrubbing the content of these proposals, conducting a legal review and preparing summary information for both an independent advisory council assessment and ultimately a source selection authority decision. The depth and breadth of this team is very impressive: our 13 evaluation team leaders have nearly 200 years of combined acquisition experience."

Stressing the importance of this program to the Air Force, Kasten says he also has a full-time, dedicated legal staff to ensure every "i" is dotted and every "t" is crossed.

"I also have a direct line to Senior Air Force legal and contracting advisors to answer questions, capture lessons from other programs, including the recent experience with the CSAR-X source selection, and ensure we do everything by the book," Kasten said.

The source selection process is rigorous, requiring months of preparation and several more months of evaluation in a tightly controlled environment. Prior to official source selection start, the KC-X program had continuous dialogue with industry. This dialogue continues through the evaluation process.

"We have transitioned to a very formal and structured process governing dialog with our industry partners in this stage of the process," said Mr. Joe Leising, Contracts Chief for the 653rd AESS, "but that doesn't mean that we cut off all contact. We have a structured feedback channel with industry and they receive periodic proposal specific updates of our evaluation progress."

Ever mindful of the possibility of a protest given the size of the KC-X program, "The program office is being extra cautious in ensuring that each step of the source selection process is thoroughly documented," Leising said.

"This acquisition program has been extremely thoroughly vetted within the Air Force and the Department of Defense," said Lt. Gen. Jack Hudson, Air Force Program Executive Officer for Aircraft, WPAFB. "We have the full support of Air Force and DoD senior leadership. Our leadership is very aware of our efforts and they have ensured we proceed in a deliberate and transparent manner, every step of the way, so that at the end of the day we have a program in which we all have high confidence that we can execute successfully."

FMI: www.af.mil

Advertisement

More News

Airborne 01.27.15: USCG Rescue!, Two Eagles Over Pacific, UAV v White House

Also: Hartzell/Red Bull, GA Coalition, Aero-Calendar, Commemorative Air Force, Sarah Brightman To ISS, Hot Air Balloon Endurance Record The pilot of a single engine Cirrus SR22 air>[...]

Pipistrel Updates WattsUp Program

Gives Inside-The-Cockpit Look At The Prototype Electric Trainer Pipistrel on Monday released a video showing an inside-the-cockpit view of their new WattsUp electric trainer ... a >[...]

AD: Airbus Airplanes

AD NUMBER: 2014-26-08 PRODUCT: All Airbus Model A330-200, -200F, and -300 series airplanes.>[...]

ANN's Daily Aero-Linx (01.28.15)

The Google Lunar XPRIZE The Google Lunar XPRIZE consists of $30 million in prizes designed to inspire pioneers to do robotic space transport on a budget. Teams from around the worl>[...]

ANN's Daily Aero-Term (01.28.15): National Route Program (NRP)

A set of rules and procedures designed to increase the flexibility of user flight planning within published guidelines.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC