NASA Aims For May 10 Discovery Launch, Three Missions In 2006 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 02, 2006

NASA Aims For May 10 Discovery Launch, Three Missions In 2006

Stresses That Testing Will Not Be Hurried

Barring a major technical problem, the next space shuttle mission could launch as soon as May 10. That's the word from shuttle program manager Wayne Hale, who in the next breath said NASA engineers will face a "somewhat aggressive schedule" to meet that launch window.

At a news conference at Kennedy Space Center in Florida, Hale and other managers emphasized they would not rush the flight in order to stay on schedule -- despite the fact much critical work remains to be done with little "contingency time" left to absorb unexpected delays.

The New York Times reports, however, that should a delay crop up -- pushing Discovery's launch to July -- Hale said NASA could still meet its goal of three shuttle missions before the end of the year.

May's launch window for a shuttle mission to the ISS runs from May 10 to May 23; the next window, from July 1 to July 19.

Helping that schedule along is the arrival at KSC Wednesday of the shuttle's external fuel tank (below), the first tank to be without an aerodynamic aid called the protuberance airload ramp, or PAL.

During Discovery's last launch in July 2005, foam from that ramp broke off the tank and nearly collided with the orbiter, in a scenario eerily reminiscent of the series of events that doomed Columbia in 2003.

One of the critical factors in determining whether Discovery will fly in May is completion of wind tunnel tests to confirm it is safe to fly the fuel tank with the PAL ramp removed (it was originally placed on the tank for a reason, after all...)

Mission launch director Michael Leinbach stressed that no portion of the remaining tests would be cut short in order to meet NASA's target launch dates.

FMI: www.nasa.gov/mission_pages/shuttle/main/index.html

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC