Wichita Says FAA Paperwork Is One Of Its Biggest Problems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Airborne-YouTube

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Tue, Jul 10, 2012

Wichita Says FAA Paperwork Is One Of Its Biggest Problems

Planemakers Say Certification Process Needs To Be Streamlined

A combination of a flood of new aviation products and a flat or shrinking FAA budget has caused a massive bottleneck in the certification process, and aviation company officials in Wichita say it is stifling innovation for and production of new airplanes and products.

GAMA Vice President of engineering and maintenance Walter Desrosier told the Wichita Eagle that even the use of FAA approved designees for the review of some products, the agency still has to sign off on every piece of paper associated with bringing a new product to market, and the agency is still "very much involved" in all aspects of product design. "The can't continue to do the old way of doing it if they don't have the resources," he told the paper.

Desrosier recommends a program that would have the agency spot-checking a company's processes, but not "kicking every tire" and "looking at every single drawing." He said there is help for the agency to concentrate its attention on "safety critical" areas of production.

The recently-passed FAA reauthorization bill does include language that "tasks" the agency with reviewing the certification process with an eye towards making it more efficient. But the agency is also on something of a learning curve, with technology sometimes progressing faster than the FAA can develop criteria for its certification. Consultant Rolland Vincent said that between the rapid pace of technological advancement and hiring freezes and reallocation of resources at the FAA have created a kind of "perfect storm" in the certification pipeline, and "everyone is dong the best they can."

FMI: www.gama.aero, www.faa.gov

Advertisement

More News

Airborne-Unmanned 03.21.17: Heron 1 FOC, Canadian UAVs BVLOS, Quad Inspects C17

Also: Terra Drone, senseFly partners with MicaSense, Quadcopter Topology Optimization The Heron 1 UAV has attained Full Operational Capability (FOC), allowing two Republic of Singa>[...]

AMA Drone Report 03.23.17: New Canada Drone Regs, 'Anti-Drone' Race, Tiny Whoop

Also: SELFLY Camera-Kickstarter, Turtle Tracking Drones, Drones Save Lives! The Canadian government has recently released new regulations for recreational drone operators that carr>[...]

Airborne 03.24.17: GA v Privatization, FAA UAS $$$, Mexico Fines

Also: NASA Authorization, Av-Associations, Essential Air Services, Kite String, Rotax @SnF, Car v Plane, FAA Forecast With the need to authorize the FAA before September 30 of this>[...]

Aero-News: Quote of the Day (03.26.17)

"Every landing on a ship is a very precise thing. When you get 300,000, it's a pretty big testament to the skill of the aviators and the personnel who maintain the recovery equipme>[...]

ANN's Daily Aero-Term (03.26.17): Circle To Runway

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC