Wichita Says FAA Paperwork Is One Of Its Biggest Problems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 10.23.17

Airborne-Unmanned 10.17.17

Airborne 10.18.17

AMA Drone Report 10.19.17

Airborne 10.20.17

Airborne-YouTube

Airborne 10.23.17

Airborne-Unmanned 10.17.17

Airborne 10.18.17

AMA Drone Report 10.19.17

Airborne 10.20.17

Tue, Jul 10, 2012

Wichita Says FAA Paperwork Is One Of Its Biggest Problems

Planemakers Say Certification Process Needs To Be Streamlined

A combination of a flood of new aviation products and a flat or shrinking FAA budget has caused a massive bottleneck in the certification process, and aviation company officials in Wichita say it is stifling innovation for and production of new airplanes and products.

GAMA Vice President of engineering and maintenance Walter Desrosier told the Wichita Eagle that even the use of FAA approved designees for the review of some products, the agency still has to sign off on every piece of paper associated with bringing a new product to market, and the agency is still "very much involved" in all aspects of product design. "The can't continue to do the old way of doing it if they don't have the resources," he told the paper.

Desrosier recommends a program that would have the agency spot-checking a company's processes, but not "kicking every tire" and "looking at every single drawing." He said there is help for the agency to concentrate its attention on "safety critical" areas of production.

The recently-passed FAA reauthorization bill does include language that "tasks" the agency with reviewing the certification process with an eye towards making it more efficient. But the agency is also on something of a learning curve, with technology sometimes progressing faster than the FAA can develop criteria for its certification. Consultant Rolland Vincent said that between the rapid pace of technological advancement and hiring freezes and reallocation of resources at the FAA have created a kind of "perfect storm" in the certification pipeline, and "everyone is dong the best they can."

FMI: www.gama.aero, www.faa.gov

Advertisement

More News

AMA Drone Report 10.19.17: Drone/Airliner Midair?, FAA Sued, CNN 107 Waiver

Also: Swedish Drone Ban Lifted, Rocky Mountain Hobby-Expo, Drone Shark Detection, Kittyhawk DJI Sync 2.0 Recent reports about a midair collision between a jet and a drone have been>[...]

Airborne-Unmanned 10.17.17: Eagles v Drones, DJI AeroScope, Drone Policy

Also: AeroVironment Award, Washington State Patrol, Altavian Nova UAS, Robotaxis The French Military is training four Golden Eagles to attack drones in flight as a way to defend ag>[...]

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

Airborne 10.20.17: Santa Monica Setback, Red Bull Aviatrix, C-49 Flies Again

Also: HondaJet World Tour, Barnstorming, SpaceX, Dauntless, Fixed-Wing VTOL, Gravitational-Waves, Swedish Drones The City of Santa Monica may now proceed with shortening the runway>[...]

Aero-News: Quote of the Day (10.23.17)

“The reality is space is becoming a common domain for human endeavor. There were different times in our history where this was predicted, but this is no longer just a predict>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC