First F-35 Center Fuselage Produced By Integrated Assembly Line Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Tue, Apr 03, 2012

First F-35 Center Fuselage Produced By Integrated Assembly Line Delivered

IAL Will Increase Affordability For The Joint Strike Fighter

The first F-35 center fuselage produced by Northrop Grumman's Integrated Assembly Line (IAL) was delivered to Lockheed Martin on March 16, 2012. While the company has delivered 69 center fuselages since 2005, this is the first produced using the IAL. The IAL maximizes robotics and automation, providing additional capacity and assembly capability while meeting engineering tolerances that are not easily achieved using manual methods.

The IAL will be central in producing the F-35's center fuselage as well as increasing the program's affordability, quality and efficiency. The technologies deployed on the IAL have created more efficient and ergonomic process for assembly. The IAL was developed and designed with the help of the Detroit-based KUKA Robotics Aerospace Division, a commercial automation integrator, and was inspired by automation systems used by American automakers.

The IAL design uses a system-engineering approach to integrate tooling and structure transport, system automation, automated drilling cells and tooling mechanization coordinated across multiple build centers.

"The Integrated Assembly Line's approach to tool design and fabrication marks a transition into a new way of business for Northrop Grumman," said Michelle Scarpella, vice president of the F-35 program for Northrop Grumman. "Through the implementation of a much more efficient design-to-assembly process, the Integrated Assembly Line enables the team to simultaneously achieve higher quality, reduce costs and increase efficiency."

As a principal member of the Lockheed Martin-led F-35 industry team, Northrop Grumman performs a significant share of the work required to develop and produce the aircraft. In addition to producing the F-35 center fuselage, Northrop Grumman also designed and produces the aircraft's radar and other key avionics including electro-optical and communications subsystems; develops mission systems and mission-planning software; leads the team's development of pilot and maintenance training system courseware; and manages the team's use, support and maintenance of low-observable technologies.

To date, the company has delivered every center fuselage on time and continues to meet its cost and schedule commitments. In 2011, the company delivered 22 center fuselages and it will make its 100th delivery in December 2012.

Northrop Grumman's Palmdale, Calif., site is a world-class facility that provides assembly, integration, testing and long-term maintenance capabilities for the F-35, and some of the world's most advanced aircraft, including B-2 Spirit and RQ-4 Global Hawk.

FMI: www.northropgrumman.com

Advertisement

More News

RFP: ANN Considering Future Options For HQ Relocation

A Very Bright Future For ANN, Aero-TV, and Airborne May Require Some New Digs ANN may be looking for a new home... hopefully, a permanent one. We're currently inviting proposals fo>[...]

Airborne 08.28.15: 'Big' Bezos Announcement?, MA Aero-Taxes, Harrison Ford

Also: Barnstorming: The FAA v Hoover Fight Ain’t Over, Hail-Damaged Dreamliner, UAV Shooter Charged, NASA Global Hawk, MiG-21 Lancers, ICAO Manual Blue Origin founder and Ama>[...]

Airshow Pilot Lost In In-Flight Breakup

Andrew Wright Lost As Giles G-202 Suffers Fuselage Seperation/Failure It's been a tough few weeks for the airshow industry... and now this -- a practice flight, Friday, August 28th>[...]

Aero-News: Quote Of The Day (08.30.15)

“This contract extension is significant for the TSA pilots. Our last round of negotiations that resulted in our current contract took more than five years, so we are pleased >[...]

ANN's Daily Aero-Term (08.30.15): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth’s surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clut>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC