Boeing Confirms P-8A Poseidon Airframe's Structural Integrity | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jan 21, 2011

Boeing Confirms P-8A Poseidon Airframe's Structural Integrity

Full Scale Static Tests Exceed Highest Expected Flight Loads By 50 Percent

Boeing said Thursday that it completed full scale static testing of the P-8A Poseidon’s airframe on Jan. 7. The series of tests, which began in May 2009, confirmed the airframe's structural integrity. “The structure performed as we expected throughout testing, allowing us to efficiently expand the P-8A’s flight-test envelope,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “Our static test plan was successful thanks to the combined efforts of Boeing’s design, analysis, and test teams and our U.S. Navy customer.”

S1 -- the program’s full-scale static ground-test vehicle -- underwent 154 different tests in which it sustained loads equal to or greater than those expected to occur during operational flights, with no failure of the primary structure. During 74 of the tests, the airframe was subjected to 150 percent of the highest expected flight loads. More than 4,000 installed strain gages and calibrated parts captured data for analysis.

In September, the Boeing P-8A team will begin refurbishing S1 to prepare it for live-fire testing at Naval Air Warfare Center, China Lake, Calif. Boeing will begin fatigue tests on its second ground-test vehicle, S2, later this year. The Navy plans to purchase 117 of the P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

A derivative of the Boeing Next-Generation 737-800, the P-8A Poseidon is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC