Boeing Receives 330-Minute ETOPS Certification For 787s | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, May 29, 2014

Boeing Receives 330-Minute ETOPS Certification For 787s

Nearly Doubles Time Allowed From A Landing Field For The Dreamliner

The FAA has approved additional extended operations (ETOPS) for the Boeing 787 Dreamliner. The move will allow 787s to be operated up to 330 minutes from a landing field and signals continued confidence in the airplane's technical capabilities.

Dreamliners have been allowed to operate up to 180 minutes away from a landing field since they were introduced into service in 2011. Granting of the expanded operational permission will allow airlines to introduce additional routes after they meet the proof of capabilities requirements and receive approval from their own regulatory agencies for such operations.

"Our customers are eager to expand their 787 operations," said Larry Loftis, vice president and general manager, 787 program, Boeing Commercial Airplanes. "We're delighted that this capability, which was designed into the airplane from the very beginning, has been certified."

ETOPS operations will make the 787 even more efficient in operations as they enable more direct flight paths, which can save thousands of pounds of fuel and reduce carbon emissions.

More than 1,030 787s have been ordered by 60 customers to date. Boeing has delivered 146 Dreamliners to 19 customers.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC