Interruption Of The VA239 Countdown: Results Of Preliminary Analysis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 08, 2017

Interruption Of The VA239 Countdown: Results Of Preliminary Analysis

New Launch Date Likely Not Until The End Of September

Just after the ignition of Ariane 5’s main stage Vulcain engine, the on-board computer detected an anomaly affecting electrical equipment on one of the two solid-propellant boosters (EAP). This anomaly led to an interruption of the automated lift-off sequence.

This interruption is perfectly compliant with our procedures which authorize a launch only if 100% of launcher equipment is fully operational. This rule guarantees the reliability and robustness of our launch system.

An analysis started immediately after the countdown interruption. It will continue to identify the anomaly’s cause and determine the measures to be taken in order to resume launch operations as soon as possible.

As the analysis is underway, Ariane 5 was transferred to the Final Assembly Building (BAF) on Thursday, September 7, once the tanks were purged. The two satellites, Intelsat 37e and BSAT-4a, are safe under the fairing atop the launcher.

As soon as the analysis of the anomaly has been completed, Arianespace will announce a new launch date. The objective is to launch around the end of September 2017.

This postponement does not affect the other launches scheduled for the end of 2017.

(Source: Arianespace news release. Image from file)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC