AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Apr 01, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-06-07

PRODUCT: Certain Boeing Model 757-200, -200CB, and -300 series airplanes.

ACTION: Final Rule.

SUMMARY:   This AD was prompted by a report of fatigue cracking found in a certain fuselage frame, which severed the inner chord and web. This AD requires inspecting the fuselage frame for existing repairs, repetitive inspections, and applicable repairs.

DATES: This AD is effective May 3, 2018.

COST: The FAA estimates that this AD affects 606 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection for existing frame repairs: 1 work-hour × $85 per hour = $85
  • Repetitive high and low frequency inspections for Groups 1 through 3 airplanes (598 airplanes): 48 work-hours × $85 per hour = $4,080 per inspection cycle.
  • Repetitive high and low frequency inspections for Groups 4 and 5 airplanes (8 airplanes): 26 work-hours × $85 per hour = $2,210 per inspection cycle
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC