Atlantis Continues On Track For November Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 06, 2009

Atlantis Continues On Track For November Launch

Orbiter Scheduled To Move To VAB Tuesday

At NASA's Kennedy Space Center in Florida technicians were back in Orbiter Processing Facility-1 Monday performing final checks on space shuttle Atlantis. The vehicle is set to move, or rollover, to the Vehicle Assembly Building Tuesday with first motion scheduled for 0700 EDT.

In the VAB, the external tank and solid rocket boosters, now secured in place, also are undergoing final checks and testing.

After Atlantis is joined with the tank and boosters, the giant crawler-transporter will be rolled under the mobile launcher platform. The entire stack now is scheduled to roll out to Launch Pad 39A on October 13.

Meanwhile, at NASA's Johnson Space Center in Houston, the STS-129 crew members will be reviewing deorbit burn procedures and space station systems manuals, and practicing heat shield repair techniques.

The astronauts are scheduled to fly to Kennedy on Oct. 19 to participate in the three-day Terminal Countdown Demonstration Test, or TCDT. Typically held prior to launch, TCDT gives the crew an opportunity to check the fit of their spacesuits, practice emergency evacuation procedures at the launch pad, review firefighting methods, and participate in briefings on security and range safety.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC