Third Poseidon Aircraft Enters Flight Testing Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 03, 2010

Third Poseidon Aircraft Enters Flight Testing Program

T3 First Flew July 29

P-8A Poseidon aircraft T3 successfully completed its first flight test in Seattle on July 29. T3 is the P-8A program's mission-system and weapon-certification aircraft.


Poseidon T3 First Flight

During the two-hour and 48-minute flight from Boeing Field, Boeing and U.S. Navy test pilots performed airborne systems checks including engine accelerations and decelerations, autopilot flight modes, and auxiliary power unit and engine shutdowns and starts. In the coming weeks, T3 will join the two P-8A test aircraft currently at Naval Air Station Patuxent River, Md., and complete additional ground and flight tests.

"At Pax River, the Boeing and Navy team will use some of the ground test data we've gathered in Seattle for in-flight separation and delivery accuracy tests that will occur later this year," said Chris Ahsmann, P-8A chief engineer for Boeing.

T3 is one of six flight-test aircraft that are being assembled and tested as part of the U.S. Navy System Development and Demonstration contract Boeing received in 2004. Airworthiness-test aircraft T1 entered flight test in October 2009 and arrived at the Navy's Patuxent River facility in April of this year. T2, the primary mission-system test aircraft, arrived at Pax River in June.

The Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC