Avcorp Signs Production Contract With Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Nov 02, 2015

Avcorp Signs Production Contract With Boeing

Will Provide Camera Fairings For KC-46 Tanker

Avcorp Industries has received notice of award from The Boeing Company for the production and supply of 767-2C panoramic camera fairings, as part of the KC-46 tanker program.

Each shipset of panoramic camera fairings consist of large and complex composites and metallic components which will be assembled into a fully integrated assembly in the Avcorp Delta facility. These fully integrated fairings attach directly to the 767-2C fuselage and will be delivered direct to the final assembly line in Everett, Washington.

Avcorp has been manufacturing and supplying Boeing with various aircraft components, including 737 wheel well fairings, 737 wing tip panels, metal bond partition panels for various Boeing aircraft and CH47 Chinook Helicopter cockpit nose enclosure assemblies and tunnel covers, for more than 20 years.

"This new contract underscores the importance of our longstanding supply partnership with Boeing.  We are proud that our supply partnership with Boeing continues to provide us with opportunities to contribute on yet another key platform with Boeing," said Peter George, Avcorp Industries Inc. CEO.

(Image from file)

FMI: www.avcorp.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC