Earliest Launch Opportunity For NASA OFT-2 Mission Is Aug. 3 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jul 31, 2021

Earliest Launch Opportunity For NASA OFT-2 Mission Is Aug. 3

OFT-2 Will Set The Stage For The First Crew Flight Test

Due to issues at the ISS, NASA elected to stand down from Friday’s launch attempt of the agency’s second Orbital Flight Test (OFT-2) mission. Currently, the earliest available launch opportunity is 1:20 p.m. EDT Tuesday, Aug. 3. The International Space Station team will use the time to continue working checkouts of the newly arrived Roscosmos Nauka multipurpose laboratory module (MLM) and to ensure the station will be ready for Starliner’s arrival.

Launch preparations will resume following a final decision from the International Space Station and Commercial Crew Program teams for the next opportunity to send Starliner on its way to complete the OFT-2 mission, which will set the stage for the first Crew Flight Test.

Earlier Thursday, Starliner atop its United Launch Alliance Atlas V rocket was moved to its seaside launch pad for standard launch preparations. Teams are assessing moving the vehicle back to its Vehicle Integration Facility to protect it from weather until launch preparations resume. Starliner and Atlas V are in a safe, flight-ready configuration and do not require any near-term servicing.

The Atlas V was assembled throughout July, which included the transfer of Starliner from Boeing’s spacecraft processing facility at NASA’s Kennedy Space Center in Florida to nearby Cape Canaveral Space Force Station Launch Complex 41 for mating atop the rocket.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC