AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, May 15, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-09-15

PRODUCT: Certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-25-18, which applied to the aircraft listed above.

AD 2016-25-18 required an inspection for discrepancies of the attachment points of the links between the engine rear mount assemblies, and corrective actions if necessary. This AD requires an inspection of certain attachment points, corrective action if necessary, and replacement of certain bolts and nuts in the engine rear mount assemblies.

This AD also adds airplanes to the applicability. This AD was prompted by the determination that replacement of certain nuts and bolts in the engine rear mount assemblies is necessary.

DATES: This AD is effective June 15, 2018.

COST: The FAA estimates that this AD affects 97 airplanes of U.S. registry.

The actions required by AD 2016-25-18, and retained in this AD take about 1 work-hour per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2016-25-18 is $85 per product.

The retained on-condition costs in this AD take about 2 work-hours per product, at an average labor rate of $85 per work-hour. Required parts cost about $730 per product. Based on these figures, the estimated cost of the on-condition actions that are required by AD 2016-25-18 is $900 per product.

The FAA has received no definitive data that would enable us to provide cost estimates for other retained on-condition actions specified in AD 2016-25-18. It will take about 4 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost up to $14,940 per product. Based on these figures, the estimated cost of this AD on U.S. operators to be up to $1,482,160, or up to $15,280 per product. No definitive data has been received that would enable the FAA to provide cost estimates for the oncondition actions specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC