FAA Denies Minnesota Runway Extension Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 23, 2010

FAA Denies Minnesota Runway Extension Project

Will Consider Resurfacing, Other Improvements

The FAA has denied a request by the Blue Earth, MN City Council for an AIP grant to lengthen the runway at Blue Earth Municipal airport (KSBU) by 1,200 feet. The agency cited a lack of traffic volume at the facility.

The grant would have also helped build a new parallel taxiway and apron at the field.

The council got the news during a report from the Bolton and Menk Engineering firm which had been working on the project, reportedly valued at just over $6 million.

The Fairbault County Register reports that Ron Roetzel from the engineering firm said the FAA would consider a grant for resurfacing the current runway, as well as construction of a taxiway and the concrete apron. Roetzel said he was unsure about the costs of the scaled-back projects.

Roetzel told the council that the FAA requires at least 500 operations per year to fund such a project. He said a 2006 survey showed at least that many aircraft movements, but that some on the council had questioned them as being "inflated." The request was also based on an anticipated increase in larger airplane and small jet traffic, but the airport only recorded 26 such operations projected in 2010.

Dandra DePottey, an FAA official in Minneapolis, wrote in a letter to the Blue Earth City Council “We have determined that a runway extension is not justified at this time. We find that this is because of a lack of forecasted demand to justify additional runway length due to changing economic conditions. A project to reconstruct the current 3,400 foot runway, the existing taxiways and apron, and construction of a full parallel taxiway can continue to be processed for 2010 funding.”

FMI: www.faa.gov, www.becity.org

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC