Citing Sensitivity, NASA Stays Quiet On DART Failure | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Apr 17, 2006

Citing Sensitivity, NASA Stays Quiet On DART Failure

Will Only Release Summary Of Findings

NASA announced last week it will only release a summary of its report outlining when and why things went wrong with a failed orbital rendezvous of two spacecraft last year, saying the information contained in the full report is too sensitive for public release.

That summary is expected to shed some -- but maybe not all -- light on why the Demonstration for Autonomous Rendezvous Technology, or DART, spacecraft failed in its automated rendezvous with an orbiting Pentagon satellite last April.

As was reported last year in Aero-News, scientists lost contact with the DART about halfway into the spacecraft's 24-hour mission to rendezvous with the satellite, and failed to complete several automated tasks including flying a close approach to the Pentagon satellite.

NASA initially said DART suffered from a fuel problem, although no leak was detected. The probe also detected errors with its onboard navigational systems.

Had the $110 million DART project been successful, it would have been the first completely autonomous rendezvous and docking between spacecraft -- a mission scientists hoped would pave the way for robots being able to perform more tasks once thought to be possible only with human oversight.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC