Navy to Begin Initial Production Of P-8A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Jan 26, 2011

Navy to Begin Initial Production Of P-8A

This First LRIP Contract Also Includes Spares, Logistics And Training Devices

The U.S. Navy announced today the award of a $1.6 billion contract to Boeing for P-8A Poseidon aircraft Low-Rate Initial Production (LRIP) of six aircraft. This first LRIP contract also includes spares, logistics and training devices. Production of the first LRIP aircraft will begin this summer at Boeing's Renton, Wash. facility.

"In 2004, the U.S. Navy and the Boeing Company made a commitment to deliver the next generation maritime patrol and reconnaissance aircraft to support a 2013 Initial Operational Capability (IOC)," said Capt. Mike Moran, PMA 290 Program Manager. "This contract and these aircraft keep that commitment on track."

Three of the six flight test aircraft, built as part of the System Development and Demonstration contract awarded to Boeing in 2004, are in various stages of testing at Naval Air Station Patuxent River, Md. The Integrated Test Team has conducted sonobuoy releases and counter measures deployments.

Recently, one of two static test planes completed full scale testing on the P-8A airframe. The first static test aircraft underwent 154 different tests with no failure of the primary structure. The second aircraft will begin fatigue testing this year. The U.S. Navy plans to purchase 117 production P-8A aircraft to replace its P-3 Fleet. IOC is planned for 2013 at NAS Jacksonville, Fla.

FMI: www.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC