Musk: Falcon Heavy Could Fly In Three Months | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jun 14, 2017

Musk: Falcon Heavy Could Fly In Three Months

SpaceX Founder Tweets Potential Timeline

The Falcon Heavy could have its first flight in as little as three months, according to a Tweet from SpaceX Founder Elon Musk.

In a Tweet posted June 8 responding to one of his Twitter followers, Musk said "All Falcon Heavy cores should be at the cape in two to three months, so launch should happen a month after that.

The Falcon Heavy combines three Falcon 9 boosters into one that is expected to be capable of lofting 119,000 pounds into orbit. All three segments of the Falcon Heavy booster are intended to be recoverable. While that's impressive, it's only about a third of what NASA's Saturn V booster carried when it sent men on their way to the Moon.

Musk hopes to mount a privately-funded trip to orbit the moon in 2018.

But Business Insider reports that SpaceX has a history of missing such aggressive deadlines. The Falcon Heavy was supposed to have flown in March, but that timeline was pushed back after the launch pad accident in September that destroyed a communications satellite.

Musk openly admits his plans are ambitious. After the first launch of a space-proven booster in March, Musk said that the payload for the first Falcon Heavy flight will probably be "something really silly" given the high-risk nature of the mission.

Such as? Well, Musk isn't saying. But on a test flight of a Dragon spacecraft in December, 2010, the cargo was a wheel of cheese.

(Image from file)

FMI: www.spacex.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC