NASA Inspector General Audit Impugns SLS Rocket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 01, 2023

NASA Inspector General Audit Impugns SLS Rocket

Bloated Project Epitomizes Reckless Spending

NASA's Space Launch System is an American super heavy-lift expendable launch vehicle by which NASA—under the auspices of the agency’s Artemis program—intends to return human beings to the surface of Earth’s moon.

The first SLS launch was made on 16 November 2022 and impelled an unmanned specimen of Lockheed-Martin’s Orion spacecraft successfully moonward.

Past successes notwithstanding, the SLS program, as of May 2023, is north of $6-billion over-budget and more than six-years behind schedule—so states a scathing new audit undertaken by NASA’s Inspector General.

Worse still, the Inspector General’s (IG) report portends additional costs and schedule increases which, if left uncorrected, are apt to jeopardize the Artemis program’s very existence.

By the planned 2025 launch of NASA’s Artemis III mission—the one slated to put astronauts boots-down in the vicinity of the lunar south-pole—the agency’s total spending on the Artemis program is expected to have surpassed $93-billion—including $23.8-billion given over to the development of the SLS system through 2022.

Designed and manufactured by United Launch Alliance—a consortium comprising Lockheed-Martin Space and Boeing Defense, Space & Security—the SLS burns up four Aerojet Rocketdyne RS-25 liquid-fuel cryogenic rocket engines with every launch. The engines—formerly known as Space Shuttle Main Engines (SSME)—each produce some 418,000 lbf thrust at liftoff.

Though not a new engine—the platform’s heritage traces back to the 1960s—the RS-25’s reliability, safety, and output have been improved over numerous upgrades.

As SLS rockets and the entirety of the components therein are wholly expendable, the inevitable expenditure of the final extant RS-25 engine will see NASA fit the SLS with Aerojet Rocketdyne’s RS-25E rocket engines—RS-25 variants ostensibly 11-percent more powerful and thirty-percent cheaper than the legacy engines.

An immense machine requiring commensurately immense liftoff thrust, the SLS, in addition to its quartet of RS-25 engines, makes use of two Northrop Grumman solid rocket-boosters.

The SLS’s founding architects posited, albeit erroneously, that incorporating older technologies, such as the RS-25 engines, into the rocket’s design would help mitigate costs—a miscalculation of which the IG’s report surmised: "These [cost] increases are caused by interrelated issues such as assumptions that the use of heritage technologies from the Space Shuttle and Constellation Programs were expected to result in significant cost and schedule savings compared to developing new systems for the SLS. However, the complexity of developing, updating, and integrating new systems along with heritage components proved to be much greater than anticipated."

To date, only five of the 16 RS-25 engine adaptations have been completed. What’s more, scope and cost increases have similarly distorted the SLS booster contract—which in the years since the Artemis program’s 2010 inception has increased from $2.5-billion to $4.4-billion and fallen five-years behind schedule.

NASA’s Inspector General ascribed blame, also, to the agency’s proclivity for cost-plus contracts, unwise  covenants by which suppliers may easily and unethically inflate budgets at taxpayer expense. The IG recommended NASA henceforth issue only fixed-price contracts.

In all the IG’s audit set forth a total of eight recommendations—the entirety of which NASA’s leadership has agreed to implement.

FMI: www.nasa.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC