P&W Awarded with $5.7B F135 Production Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 08, 2019

P&W Awarded with $5.7B F135 Production Contract

Engine Powers All Variants Of The F-35 Lighting II Airplane

Pratt & Whitney has been awarded a production contract for the 12th and 13th lots of F135 propulsion systems, powering all three variants of the F-35 Lightning II aircraft.

This award represents the largest-ever F135 production contract, funding more than 332 engines for the U.S. armed services and international customers, and includes program management, engineering support, production support, and tooling. The total contract value for Lot 12-14 is approximately $5.7 billion and it covers all Lot 12 and Lot 13 engines, with priced options for Lot 14.

“This is a significant milestone for the program and underscores the hard work of our joint government and industry team,” said Matthew Bromberg, president of Pratt & Whitney Military Engines. “We’re proud to be delivering 5th-generation propulsion capability at a great value for the warfighter.”

“With more than 500 F135 engines delivered to date, we’re at an exciting inflection point for the program. We are laser-focused on standing up an effective global sustainment network that will support the F135 throughout its lifecycle,” Bromberg said.

The combat-proven F135 is the most advanced fighter engine ever produced, delivering more than 40,000 lbs. of thrust and unmatched advances in safety, design, performance, and reliability.

(Image provided with Pratt & Whitney news release)

FMI: www.pw.utc.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC