Ready For F-35s: Runway Resurfaced At RAF Marham | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jun 06, 2018

Ready For F-35s: Runway Resurfaced At RAF Marham

Vertical Landing Pads For 'B' Variant Still Under Construction

Preparations for the arrival of the UK’s new F-35 multi-role combat aircraft have taken a major step forward with the completion of resurfacing work on the secondary runway at RAF Marham. This took place with little to no impact on operational activity.

The first F-35 Lightning aircraft are due to arrive at their new home at RAF Marham shortly. The aircraft, which will be operated by both the Royal Air Force and Royal Navy, will be based at RAF Marham. Preparations are on track for the aircraft to be able to deploy from RAF Marham to deployed operating bases by the end of the year. In due course they will also deploy to the Royal Navy’s Queen Elizabeth Class aircraft carriers.

The resurfacing work was undertaken by the Defence Infrastructure Organization (DIO) through its contractors, a joint venture of Galliford Try and Lagan Construction. It forms part of a $334 million DIO program of investment at the station and involves resurfacing about 90% of the airfield operating surfaces; all of this while the Tornado Force maintained operations from the airfield.

'The completion of the resurfacing of the secondary runway is one a series of milestones for the work DIO and our contractors are undertaking to prepare RAF Marham to be the main operating base for the new F-35B aircraft," said Rob Dawson, DIO’s Principal Project Manager. "Along with work being completed by our colleagues at Defence Equipment and Support, this investment will transform RAF Marham with a host of new and upgraded facilities for the aircraft and the men and women who will operate them.'

'It’s fantastic to have the secondary runway handed back to the station after the completion of the resurfacing in preparation for the imminent arrival of the F-35 Lightning," said RAF Marham Station Commander Group Captain Ian Townsend. "To see the Tornado’s take off from it for the first time was a real milestone in the program and we look forward to the next historic event in the next couple of weeks when the F-35’s will touch down on the new runway as it arrives at its home base for the first time.'

Resurfacing the 6,000-foot long runway required the construction of two batching plants to prepare the specific asphalt and concrete needed for the new surface. Preparing the materials on site increased efficiency.

RAF Marham is currently the home of the RAF’s Tornado fleet, which will begin operating from the runway immediately before being joined by the F-35s in due course. With the aircraft currently on operations it was important that this activity could be maintained without restriction. During the work, flying was only halted for three weeks while construction teams resurfaced an intersection between the main runway and the secondary runway. This was completed a day early despite poor weather.

The remainder of the work being undertaken at RAF Marham continues, including construction of three vertical landing pads to enable the F-35s to use their vertical landing capability and a squadron headquarters for 617 Squadron (The Dambusters).

Other work includes a high voltage power upgrade, refurbishment of 12 Hardened Aircraft Shelters and a small gym and canteen as well as a hangar, offices and technical facilities for 207 Squadron.

(Source: U.K. MoD news release. Image from file)

FMI: www.gov.uk/government/organisations/ministry-of-defence

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC