Adam A700 Celebrates Year One | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Aug 18, 2004

Adam A700 Celebrates Year One

A500 Claims City Pair Records

Marking the first anniversary of the A700's debut at Oshkosh in July 2003 and the third showing of the A500 centerline twin, Adam Aircraft reports that they took nine orders for its two aircraft models during EAA AirVenture 2004.

Having surprised spectators last year with the arrival of the A700, Adam Aircraft provided yet another new experience for show-goers this year. The A700 that arrived at Oshkosh claims to be the first flying aircraft in the closely followed personal jet segment to have an installed interior featuring seven seats and an aft lavatory. Hundreds of visitors sat in the A700 and experienced the new class of aircraft.

The A500 made its third showing at Oshkosh this year and continues to make slow, much-delayed progress toward FAA Type Certification. Since this summer, the A500 has claimed three national and two world records for speed over a recognized course. On one flight from Los Angeles to Denver, the A500 averaged 279 MPH and completed the trip in 2 hours 59 minutes. Other record flights are planned around Adam Aircraft's participation in the NBAA and AOPA trade shows later this fall.

With more than 60 orders reported for the A500, Adam Aircraft reports that it has accumulated a strong customer base. Certification of the A500 is nearing the final stages, after several years of delays. With 98% FAA conformity on the aircraft, 94% completion of structural testing, and 66% completion of system testing, Adam Aircraft is forecasting Type Inspection Authorization (TIA) by month-end. Once TIA is achieved, they hope for 12 additional weeks of flight and systems tests before Initial Type Certification and an additional four weeks before full certification -- which assumes that there are no delays in the above-mentioned timeline (and noting that their previous prognostications have been WAY off the mark). Company officials expect that the A500 will be fully certified by year-end 2004.

FMI: www.adamaircraft.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC