Sea Launch Begins New Countdown For Thuraya-3 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 14, 2008

Sea Launch Begins New Countdown For Thuraya-3 Launch

Liftoff Scheduled Early Tuesday Morning

Representatives with Sea Launch tell ANN its team has arrived at its launch site on the Equator and initiated a new 72-hour countdown, in preparation for the launch of the Thuraya-3 mobile communications satellite on Tuesday, January 15. Liftoff is planned at the opening of a 44-minute window, at 0349 Pacific Standard Time (1149 GMT).

As ANN reported, a November launch attempt was scrubbed due to unusually strong currents. The Sea Launch Commander and the Odyssey Launch Platform have returned to the launch site at 154 degrees West Longitude for launch operations. A day before liftoff, the launch team will erect the Zenit-3SL rocket on the launch pad and perform final tests on the launch system and the spacecraft before beginning the terminal countdown.

During final preparations for liftoff, the platform will be evacuated, with all personnel safely positioned on the ship, four miles from the platform. At launch, the rocket will lift the 5,173 kg (11,381 lb) spacecraft to geosynchronous transfer orbit, on its way to a final orbital location of 98.5 degrees East Longitude.

Boeing designed and built the GEO-Mobile (GEM) spacecraft in El Segundo, CA, for Thuraya Satellite Telecommunications Company, based in the United Arab Emirates. Boeing also built, and Sea Launch successfully deployed, Thuraya-1 (October 20, 2000) and Thuraya-2 (June 10, 2003). The satellites are designed to provide a range of mobile voice and data services over large geographic regions.

FMI: www.boeing.com/nosearch/sealaunch, www.sealaunch.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC