1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC