Pad 39A Conversion Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Nov 24, 2014

Pad 39A Conversion Underway

SpaceX Modifying The Historic Site For Its Falcon Heavy Rocket

Modifications of launch Pad 39A at the Kennedy Space Center are underway, as SpaceX prepares for the first launch of a Falcon Heavy rocket from the historic facility.

The pad was mothballed by NASA and the Kennedy Space Center after the shuttle program ended in 2011. It was one of the last visible reminders of that era of space travel.

With all SLS launches planned for pad 39B, NASA awarded the right to repurpose 39A to SpaceX, and the private company hopes to be able to launch the first of its new heavy rockets next summer.

NASASpaceflight.com reports that most of the work currently underway seems to be on the perimeter of the launch site, and a SpaceX says that the pad will retain much of its current appearance. For Instance, according to SpaceX spokesman John Taylor, the Rotating Service Structure (RSS) that had been an integral part of the payload installation process for the Shuttle will remain in place. There had been speculation that SpaceX would also add to the Fixed Service Structure (FSS) at the pad, but Taylor said that for now, it will remain at its current height, but with some structural reinforcements.

A date of July 1, 2015 has been set for a "Wet Dress Rehearsal" (WDR) for the Falcon Heavy to validate the rocket and launch systems. The next steps would be a Static Fire test and a Launch Readiness Review before the actual first flight test is conducted.

(NASA image of Discovery at Pad 39A)

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC