Curiosity Resumes Science After Analysis Of Voltage Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 27, 2013

Curiosity Resumes Science After Analysis Of Voltage Issue

Full Operations Resumed Saturday

NASA's Mars rover Curiosity resumed full science operations on Saturday, Nov. 23. Activities over the weekend included use of Curiosity’s robotic arm to deliver portions of powdered rock to a laboratory inside the rover. The powder has been stored in the arm since the rover collected it by drilling into the target rock "Cumberland" six months ago. Several portions of the powder have already been analyzed. The laboratory has flexibility for examining duplicate samples in different ways.

The decision to resume science activities resulted from the success of work to diagnose the likely root cause of a Nov. 17 change in voltage on the vehicle. The voltage change itself did not affect the rover safety or health. The vehicle's electrical system has a "floating bus" design feature to tolerate a range of voltage differences between the vehicle's chassis -- its mechanical frame -- and the 32-volt power lines that deliver electricity throughout the rover. This protects the rover from electrical shorts.
 
"We made a list of potential causes, and then determined which we could cross off the list, one by one," said rover electrical engineer Rob Zimmerman of NASA's Jet Propulsion Laboratory, Pasadena, CA. Science operations were suspended for six days while this analysis took priority. The likely cause is an internal short in Curiosity's power source, the Multi-Mission Radioisotope Thermoelectric Generator. Due to resiliency in design, this short does not affect operation of the power source or the rover. Similar generators on other spacecraft, including NASA's Cassini at Saturn, have experienced shorts with no loss of capability. Testing of another Multi-Mission Radioisotope Thermoelectric Generator over many years found no loss of capability in the presence of these types of internal shorts.

Following the decision to resume science activities, engineers learned early Nov. 23 that the rover had returned to its pre-Nov. 17 voltage level. This reversal is consistent with their diagnosis of an internal short in the generator on Nov. 17, and the voltage could change again. The analysis work to determine the cause of the voltage change gained an advantage from an automated response by the rover's onboard software when it detected the voltage change on Nov. 17. The rover stepped up the rate at which it recorded electrical variables, to eight times per second from the usual once per minute, and transmitted that engineering data in its next communication with Earth. "That data was quite helpful," Zimmerman said.
 
In subsequent days, the rover performed diagnostic activities commanded by the team, such as powering on some backup hardware to rule out the possibility of short circuits in certain sensors.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC