AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Sep 26, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-18-04

PRODUCT: All Airbus SAS Model A300 series airplanes; Model A300 B4-600, B4-600R, and F4-600R series airplanes,and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes); and Model A310 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2005-17-14, which applied to the aircraft listed above.

AD 2005-17-14 required repetitive tests to detect desynchronization of the rudder servo actuators, and adjustment or replacement of the spring rods of the rudder servo actuators, if necessary. AD 2005-17-14 also required repetitive tests/inspections/analyses of the rudder servo actuators, and related investigative/corrective actions if necessary.

This AD retains some requirements of AD 2005-17-14 and revises the inspection procedures and compliance times, as specified in a European Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by reports of desynchronization of the rudder servo actuators.

DATES: This AD is effective October 30, 2019.

COST: The FAA estimates that this AD affects 133 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Required Actions:

  • Retained actions from AD 2005-17-14: 1 work-hour × $85 per hour = $85 per airplane.
  • New actions: 2 work-hours × $85 per hour = $170 per airplane.

On-Condition Costs

  • 34 work-hours × $85 per hour = $2,890 per airplane.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC