New Aircraft Battery Parasitic Load Tester Introduced | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Apr 02, 2011

New Aircraft Battery Parasitic Load Tester Introduced

Concorde Device Mates With MS3509 Receptacle

Concorde Battery Corporation has released a new Parasitic Load Tester (PLT) to measure the parasitic load / drain on aircraft batteries when the master switch is off and the aircraft is inactive. The tester is designed to mate with a MS3509 style quick disconnect receptacle. This innovative PLT was conceived and engineered in response to concerns in the aviation community about the effect of parasitic loads / drains on battery capacity, state of charge, airworthiness and battery life.

A parasitic load is a small, continuous flow of DC current that takes power from the battery when the master switch is off. Parasitic loads are present in most modern aircraft to some degree. Examples of parasitic loads are relays, clocks, radios and on board computers. Depending on the magnitude of the parasitic load, the battery in an inactive aircraft may be depleted within weeks or even days.  A battery discharged in this manner can cause an AOG event. Another inherent danger is that a battery without enough emergency power reserve can often still start the engine(s), leaving you vulnerable in the case of a generator failure. The FAA requires aircraft batteries to be certified with a minimum of 80% capacity for emergency power reserve in the event of an electrical generating system failure.

Repetitive deep discharges from parasitic drain will shorten the battery life and batteries deeply discharged in this manner may not be recoverable. If authorized by the aircraft manufacturer, disconnecting the battery from the battery plug when the aircraft is stored will eliminate the parasitic load.

Measuring parasitic load is easy to do by connecting the PLT between the battery receptacle and the aircraft mating plug. The PLT is a molded polypropylene body equipped with separate test leads for connection to a digital multimeter (DMM). Concorde PLT part number 4102, is rated for loads up to 10 amperes and is equipped with a 10 amp fuse.

FMI: www.concordebattery.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC