A380 Future Hinges On Emirates Deal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jan 02, 2018

A380 Future Hinges On Emirates Deal

Sources Say Company Is Drafting Contingency Plans For Phaseout Of The Super-Jumbo Airliner

The future of the A380 Super-Jumbo airliner appears to rest with Emirates, which is hedging on an order it had earlier placed for the airplane.

Reuters cites three sources familiar with the matter who say that Airbus is drafting a contingency plan to phase out production of the airplane if the deal with Emirates falls through.

Emirates has total orders for 142 of the big gets, but talks for 36 new airplanes recently hit a snag over production schedules at the Dubai Air Show last month. While negotiations have resumed, there is no sign of significant progress between the two sides.

One source said that if there is no deal with Emirates, Airbus will begin the shutting down production of the A380. But the process would be gradual, allowing the planemaker to fill the orders it has on the books, including some from Emirates.

While there is interest from other airlines for the four-engine jet, Airbus is wary of continuing to produce the airplanes without the guarantee of the major order from Emirates. The airline, meanwhile, wants a guarantee that Airbus will continue to produce the airliner for at least a decade to go forward with the deal.

The planemaker currently has 97 unfilled orders for the A380, according to the report. Industry sources say 47 of those are unlikely to be delivered based on airlines intentions and finances.

(Image from file)

FMI: Original Report

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC