AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, May 29, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-08-07

PRODUCT: All Airbus SAS Model A318 and A319 series airplanes; Airbus SAS Model A320-111, -211, -212, -214, -231, -232, and -233 airplanes; and Airbus SAS Model A321-111, -112, -131, -211, -212, -213, -231, and -232 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-20-04, which applied to the aircraft listed above.

AD 2014-20-04 required repetitive inspections of the titanium angles between the belly fairing and the keel beam side panel, an inspection of the open holes of cracked titanium angles, and corrective action if necessary.

This AD continues to require those actions, adds Model A320-216 airplanes, and requires a detailed inspection for, and replacement of, certain rivets, and corrective actions if necessary.

This AD was prompted by reports of cracks at the lower riveting of the four titanium angles that connect the belly fairing to the keel beam side panels.

DATES: This AD is effective June 26, 2019.

COST: The FAA estimates that this AD affects 1,250 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • 295 work-hours × $85 per hour = $25,075 (Retained actions from AD 2014-20-04) Parts: $1,045. Cost per airplane: $26,120.
  • Up to 168 work-hours × $85 per hour = Up to $14,280 (New actions of this AD). Parts: $0. Cost per airplane: Up to
  • $14,280.
  • On-Condition Costs: Labor: 168 work-hours × $85 per hour = $14,280
FMI: AD

 


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC