Navy Awards Sikorsky Contract To Build Six More CH-53K Heavy Lift Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 30, 2020

Navy Awards Sikorsky Contract To Build Six More CH-53K Heavy Lift Helicopters

The Six Helicopters Are Part Of 200 Aircraft Program Of Record

The CH-53K has flown more than 2,000 flight hours validating the aircraft's performance, including testing on a ship and in both hot and cold environments. This year, the helicopter completed air-to-air refueling with a 27,000-lb. external load demonstrating its ability to enable heavy-lift transport from sea to shore.

Sikorsky will build six additional production CH-53K King Stallion helicopters under a new contract for the US Navy. The aircraft will further support the U.S. Marine Corps in its mission to conduct expeditionary heavy-lift assault transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations.

The six helicopters are part of 200 aircraft Program of Record for the U.S. Marine Corps, and their addition makes a total of 24 CH-53K production aircraft now under contract. Under the terms of this most recent contract – known as Low Rate Initial Production (LRIP) Lot 4 – Sikorsky will begin deliveries of the six aircraft in January 2024.

"This contract award is a testament to the government's confidence in the CH-53K platform. This award shows that we are working hard to make the aircraft more affordable," said Major General Greg Masiello, program executive office, air ASW, assault and special mission programs. "The capability and affordability of the CH-53K is important to ensure that we provide a valuable addition to the United States Marine Corps and our friends and allies."

The CH-53K program has five aircraft on the line at Sikorsky facilities in Connecticut and over  two dozen in various stages of production. The program will deliver the first low rate initial production aircraft in September 2021.

Sikorsky and its suppliers have made significant investments in facilities, machinery, tooling, and workforce training to ramp up production required for the CH-53K program. For example, for the first time, newly installed 10-ton cranes lifted a 12,000 lb. gearbox into a CH-53K production aircraft.

"The production of this CH-53K helicopter represents a new era in capabilities, technologies, safety and mission flexibility for the U.S. Marine Corps. Sikorsky is committed to supporting the Marine Corps to maximize the benefits of this all new helicopter," said Bill Falk, Sikorsky CH-53K program director.

"Pilots are already training on state-of-the art flight training devices to prepare in a safe, cost-effective manner for operational deployment," Falk said.

The CH-53K is also nearing the conclusion of the developmental flight test events in preparation for Initial Operational Test & Evaluation (IOT&E), having flown more than 2,000 flight hours validating the aircraft's performance on a ship and in both hot and cold environments.

This year, the aircraft completed:

  • Air-to-air refueling with an external load
  • Initial sea trials
  • Flight tests in extremely hot and dusty conditions at U.S. Army Yuma Proving Ground in Yuma, Arizona


Other accomplishments include:

  • Maximum weight single-point cargo hook sling load of 36,000 pounds (16,329 kilograms)
  • Forward flight speed of over 150 knots
  • 60-degree angle-of-bank turns
  • Altitude of 18,500 feet mean sea level (MSL)
  • 12-degree slope landings and takeoffs
  • External load auto-jettison
  • Gunfire testing
 
FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC