X-51A WaveRider Test Flight Set For Next Week | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 21, 2010

X-51A WaveRider Test Flight Set For Next Week

Only Hypersonic Test Flight Planned For This Fiscal Year

The X-51A WaveRider will make its first hypersonic flight test attempt from Edwards Air Force Base on Tuesday, May 25. The unmanned aerial vehicle will be released from a B-52 bomber off the southern California coast.

The X-51A is expected to fly autonomously for five minutes -- powered by a supersonic combustion ramjet (scramjet) motor -- accelerate to about Mach 6 and transmit large amounts of data to ground stations before it splashes down into the Pacific and breaks up, as planned. There are no plans to recover the flight test vehicle, one of four built.

"In those 300 seconds, we hope to learn more about hypersonic flight with a practical scramjet engine than all previous flight tests combined," said Charlie Brink, X-51A program manager with the Air Force Research Laboratory's Propulsion Directorate at Wright-Patterson Air Force Base. The longest previous hypersonic scramjet flight test, performed by a NASA X-43 in 2004, was faster, but lasted only about 10 seconds and used less logistically supportable hydrogen fuel.

The X-51A program is a collaborative effort of the Air Force Research Laboratory and the Defense Advanced Research Projects Agency, with industry partners The Boeing Company and Pratt & Whitney Rocketdyne.

The May 25 attempt will be the only hypersonic flight attempt this fiscal year, a change from the original test plan, which was to fly once in December 2009 and three more times in 2010. A combination of factors, including high demand for flight-test and range assets such as the B-52, contributed to the pause.

"This is an experimental X-plane and it's a complicated test. We knew the original schedule was aggressive and we would need to be flexible," said Brink. "It's also expensive to keep a staff of engineers and support staff at the ready and then not be able to fly when supporting assets aren’t available. So we elected to make only one hypersonic try this spring and then pause for a few months to conserve funding."

Alex Lopez, Boeing vice president of Advanced Network & Space Systems, said the X-51A program will pave the way to hypersonic weapons and future access to space.

FMI: www.af.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC