Tampa Aviation Official Says No Plans To Make TPF Larger | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 29, 2008

Tampa Aviation Official Says No Plans To Make TPF Larger

Stresses Airport's Relationship With Community

Peter O. Knight Airport (TPF) and the Tampa Bay area of Florida have an interesting historical relationship. After years of planning, the Great Depression stalled construction until the airport was adopted by the Federal Works Project Administration, a federal jobs program aimed at speeding the nation's economic recovery.

Starting with its opening in 1935, Peter O. Knight was the area's principal commercial airport, served by both Eastern and National Airlines until they relocated to Tampa International in 1946. The airport has since flourished as a general aviation facility, that in 2005 hosted the aircraft exhibit for the annual Aircraft Owners and Pilots Association Expo in Tampa.

The airport has also survived in relative peace with its neighbors in the trendy Davis Islands area... but that appears to be changing. A plan by the Hillsborough County Aviation Authority to move runway 3/21 to the south by 175 feet has led to NIMBY concerns the authority is courting a return of bigger planes.

Louis E. Miller, executive director of the Hillsborough County Aviation Authority, recently wrote an open letter to the public, seeking to clarify the authority's intent, and diffuse any suspicion that the board has a big-plane agenda.

The letter was printed Monday in the Tampa Tribune. In it, Miller says, "The Aviation Authority has the obligation to operate the airport in a safe and efficient manner. In order to fulfill this obligation, we have presented a reconfiguration of Runway 3/21 to provide a mandated runway safety area.

"This regulatory mandate requires an overrun area of 240 feet on both ends of the runway. The north end of the runway adjacent to the Seddon Channel does not meet this requirement so we intend to shift the runway 175 feet to the south, which will bring both ends of Runway 3/21 into compliance with federal requirements.

"These changes will not increase the airport's capacity or ability to serve larger aircraft. Our plan also calls for constructing new hangars that will be sized to accommodate existing users of Peter O. Knight Airport, not to increase the activity or size of aircraft at the airport."

Miller closed his letter with a promise to always consider the impacts of any proposed development on the community... which is still shaken by a 2006 fatal accident near the airport, in which a King Air attempting to land at TPF during a tropical storm impacted an area home.

As ANN reported, the plane's pilot was the sole fatality in that accident; the co-pilot was seriously injured.

FMI: www.tampaairport.com/about/general_aviation/tpf.asp

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC