AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Nov 07, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-19-01

PRODUCT: All Airbus SAS Model A320-251N and -271N airplanes, and Model A321-251N, -253N, -271N, and -272N airplanes.

ACTION: Final rule

SUMMARY: This AD was prompted by reports that the regulated bleed temperature was measured above the design target with a temperature regulation shift phenomenon, and investigation results show that incorrect temperature regulation can degrade pneumatic system components located downstream of the precooler.

This AD requires uploading improved bleed monitoring computer (BMC) software (SW), as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

DATES: This AD is effective December 11, 2019.

COST: The FAA estimates that this AD affects 85 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Labor: 4 work-hours × $85 per hour = $340 per airplane.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC