Lunar Reconnaissance Orbiter Undergoes Critical Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jan 12, 2008

Lunar Reconnaissance Orbiter Undergoes Critical Tests

Scheduled For Late-2008 Launch

NASA's next mission to Earth's closest astronomical body is in the midst of integration and testing at NASA's Goddard Space Flight Center in Greenbelt, MD.

The Lunar Reconnaissance Orbiter, known as LRO, will spend at least a year mapping the surface of the moon. Data from the orbiter will help NASA select safe landing sites for astronauts, identify lunar resources and study how the moon's environment will affect humans.

Engineers at Goddard are building the orbiter and rigorously testing spacecraft components to ready them for the harsh environment of space. After a component or entire subsystem is qualified, it is integrated into the LRO spacecraft. The core suite of avionics for the orbiter is assembled and undergoing system tests.

"This is a major milestone for the mission," said Craig Tooley, LRO project manager at Goddard. "Our team has been working nearly around the clock to get us to this point. Reaching this milestone keeps us on the path to sending LRO to the moon later this year."

Various components of the avionics and mechanical subsystem are in the process of going through their qualification program. Six instruments and one technology demonstration aboard the spacecraft will provide important data to enable a safe and productive human return to the moon. The six instruments are scheduled to arrive at Goddard in the coming months for integration.

The spacecraft will ship to NASA's Kennedy Space Center, FL, in August in preparation for launch.

The orbiter and the Lunar Crater Observation and Sensing Satellite will launch aboard an Atlas V rocket in late 2008. The trip to the moon will take approximately four days. The Lunar Reconnaissance Orbiter initially will enter an elliptical orbit, also called the commissioning orbit. Once moved into its final orbit, a circular polar orbit approximately 31 miles above the moon, the spacecraft's instruments will map the lunar surface.

FMI: http://lro.gsfc.nasa.gov/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC