FAA Grants NATA-Requested Crewmember Relief | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Apr 02, 2020

FAA Grants NATA-Requested Crewmember Relief

Exemptions Available To All Part 119 Certificated Carriers Operating Under Part 135

The FAA has issued exemptions in response to the National Air Transportation Association’s (NATA) requests for relief from certain crew training and checking requirements for Part 135 operators.

The two exemptions granted to NATA are available to all Part 119 certificated carriers operating under Part 135. Two additional exemptions granted to A4A provide similar relief for those conducting training under Part 121. All operators seeking to use the available relief are required to provide a Letter of Intent to the FAA in the manner and form described in the exemption, obtain Operations Specification A005 from their FAA inspector, and follow other conditions and limitations outlined within the exemption. Every Part 135 operator should obtain and carefully review these exemptions.

Exemption No. 18509 Regulations addressed: §§ 135.293(b), 135.295(e) and (g), 135.297(c)(1)(i) and (ii), 135.331(c)(3), (5), and (7), 135.347(a), and 135.351(b)(2) and (c)

  • Provides alternative methods to conduct certain required crewmember emergency procedures during recurrent and upgrade training, testing, and checking.

Exemption No. 18510 Regulations addressed: §§ 135.245(c), 135.247(a), 135.301(a), 135.323(b), 135.337(g), 135.338(g), 135.339(b), 135.340(b), and 135.505(d)

  • Provides additional time for completion of recurrent training and qualification activities for ground personnel and crewmembers of up to three calendar months after the month that the activity was due to have been completed.

Exemption No. 18511 and Exemption No. 18512 provide similar relief for those Part 135 operators required or opting to comply with Part 121 training regulations.

“NATA staff has been meeting with FAA and other government officials daily during this crisis to obtain the latest information for members and provide input on industry needs. The Association is grateful the FAA is acting quickly to ensure necessary access to air transportation remains available,” stated NATA president and CEO Timothy Obitts.

“These exemptions address several currency matters of operators. I am confident additional action granting relief for certain expiring pilot medicals is forthcoming. In this time of great need, NATA and our members value the FAA’s willingness to collaborate on effective solutions,” stated NATA vice president John McGraw.

(Source: NATA news release)

FMI: www.nata.aero

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC