Investigation Finds DEN Was Unprepared For Blizzard | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 29, 2007

Investigation Finds DEN Was Unprepared For Blizzard

Well, Duh...

It comes as no surprise to virtually anybody who was affected by the blizzard that hit Denver, CO last month -- not only in Denver, but around the country -- that the Mile High City and its airport were not prepared to take on a storm of such monumental proportions.

A preliminary report on Denver International Airport's (DIA) response to last month's blizzard says, get ready, "the airport wasn't ready for a storm that big and the problems will cost tens of millions of dollars to fix." This, according to The Denver Post.

DIA, for those who did not pick up on the round-the-clock news storm coverage and its impact, was closed for 45 hours beginning December 20. More than 2,000 flights were canceled and some 4,700 travelers were stranded.

Not to be caught in a similar circumstance, DIA officials hired a consultant to review the airport's performance. Tim Phillips' preliminary report noted that DIA had the equipment and staff to keep two runways open during a storm with six to eight inches of snow over 12 hours. DIA receives an average of 60 inches of the white stuff annually.

This storm wasn't about to go by the books, however. It dumped 20 to 22 inches over 34 hours. And with a blizzard, comes winds. Winds up to 40 mph piled the snow four feet and more. By the afternoon of December 20, airport officials halted operations.

"We had zero visibility, blowing snow and 40 mph winds," said DIA aviation manager Turner West. "It was not safe."

When the airport re-opened at noon on December 22, the damage had already been done. United Airlines lost $30 million in passenger revenues from that blizzard and the one that followed a week later. Frontier Airlines lost $13 million. And thousands of people around the country felt the impact, as reported by ANN.

Phillips' report also includes an assessment that DIA's snow-removal plan for the critical ramp area between concourses was understaffed, under-equipped -- and inadequate for a snowfall above four inches on the ramp. Snow, of course, needs to be removed to allow planes access to their ramp gates.

Additionally, because of the amount of snow, the airport had to truck it to more remote sites in order to clear critical areas, as its usually area for snow dumping was lost to... snow.

Phillips' preliminary report recommends in the future, DIA use large, industrial snow melters -- similar to systems at Chicago's O'Hare airport -- that can melt up to 600 tons of snow an hour and be placed near ramp area storm drains.

He also recommended that DIA purchase high-speed multifunction snow-removal machines that combine plowing, sweeping and snow blowing in one unit.

FMI: www.flydenver.com, www.criticalpathinc.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC