Piaggio Wins Photo Recon Aircraft Contract From Royal Thai Air Force | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Oct 01, 2014

Piaggio Wins Photo Recon Aircraft Contract From Royal Thai Air Force

P.180 Avanti II Selected As Aerial Reconnaissance Platform

The  Royal Thai Air Force (RTAF) has awarded a contract to Piaggio Aero to provide a photo reconnaissance aircraft.

Piaggio Aero was selected as the winner bidder by the RTAF Special Procurement Committee, and a contract was signed Tuesday at Piaggio Aero’s headquarters by the Deputy Chief of Staff of the RTAF, Air Chief Marshal Sutthiphan Kritsanakhup and the CEO of  Piaggio Aero, Carlo Logli, in the presence of General Carlo Magrassi, National Security Advisor to the Italian Prime Minister, and Aerial Squadron Marshall General Enzo Vecciarelli from the Italian Air Force.

The selected aerial reconnaissance platform will be based on the P.180 Avanti II aircraft, customized for territorial multifunctional surveillance, featuring customized photography systems for which the Avanti aircraft is ideally outfitted.

The Piaggio Aero P.180 Avanti is a twin engine, three lifting surfaces, special missions aircraft configured for photo reconnaissance. The single pilot certified Avanti II has a rage of 1,450 nm, four hour endurance, a maximum speed of 402 kts and is able to reach an altitude of 41,000 ft; these performances can be compared to those of a turbojet aircraft, maintaining 40% lower fuel consumption than any same size jet.

The Avanti features the widest cabin of its segment, which  combined with the operational flexibility of the aircraft and the multiplicity of the equipment that can be installed, is the most cost effective solution for special mission configurations.

(Image from file)

FMI: www.piaggioaero.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC