AD: Gulfstream Aerospace Corporation Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, May 30, 2012

AD: Gulfstream Aerospace Corporation Airplanes

AD NUMBER: 2012-11-06

PRODUCT: All Gulfstream Aerospace Corporation Model G-1159, G-1159A, and G-1159B airplanes.
SUBJECT: Airworthiness Directive 2012-11-06
ACTION: Final Rule

SUMMARY: This AD requires, for certain airplanes, a measurement to determine the clearance (gap) of the exposed rounded portion of the doubler and clothespin fitting at the wing-to-fuselage attachment, and repair if necessary. This AD also requires, for certain other airplanes, determining if a certain aircraft service change has been incorporated, and for affected airplanes, a measurement to determine the clearance (gap) of the exposed rounded portion of the doubler and clothespin fitting at the wing-to-fuselage attachment, and repair if necessary.

This AD was prompted by a report of an improper structural modification that had excessive gaps in the wing-to-fuselage attachment fittings. The FAA is issuing this AD to detect and correct excessive gaps in the wing-to-fuselage attachment fittings, which could result in reduced structural integrity at the wing-to-fuselage attachment and consequent separation of the wing from the airplane.

DATES: This AD is effective May 29, 2012.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC