NASA Issues Proposal Request For Ares I Avionics Unit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne Unlimited-09-17-18

Airborne Unmanned-09.18.18

Airborne Unlimited-09.19.18

AMA Drone Report-09.20.18

Airborne Unlimited-09.21.18

Airborne-YouTube

Airborne Unlimited-09-17-18

Airborne Unmanned-09.18.18

Airborne Unlimited-09.19.18

AMA Drone Report-09.20.18

Airborne Unlimited-09.21.18

Fri, Jun 08, 2007

NASA Issues Proposal Request For Ares I Avionics Unit

Raytheon Already Has Hat In The Ring

NASA has issued a request for proposal Wednesday for key guidance, navigation and control hardware for the new Ares I crew launch vehicle. The upper stage instrument unit avionics is to be used during the Ares I ascent.

Proposals are due by July 30 and a selection expected in November. The contract will be awarded through a full and open competition, according NASA.

The avionics unit will provide guidance, navigation and control for the entire launch vehicle as it transports the Orion crew exploration vehicle to low Earth orbit.

The request for proposal calls for the winning contractor to work closely with the NASA design team to provide engineering support during the design phase. It also specifies that the contractor will produce avionics for the development and flight program and will provide sustained engineering support for the upper stage avionics system through 2016.

As they say, the early bird gets the worm. Raytheon Company told ANN last month the company planned to submit a proposal as the prime contractor to partner with NASA on the development and manufacture of the avionics unit for the Crew Launch Vehicle that will carry astronauts into orbit when the Space Shuttle is retired in 2010.

"Raytheon is uniquely positioned to support the NASA design team at Marshall Space Flight Center on a program that is as bold and innovative as the Ares I Crew Launch Vehicle," said Louise Francesconi, Raytheon Missile Systems president. "Our technical expertise, innovative solutions, mature manufacturing processes and more than 40 years of space experience make us the right partner for NASA."

FMI: www.exploration.nasa.gov

Advertisement

More News

Airborne 09.21.18: Paul Allen's MonsterPlane, Reno Air Races, Diamond Doubles

Also: Aviators Indicted, Hartzell Appointment, World's First 777, ASTM Parachutes For Drones Stratolaunch Systems founder Paul Allen has put his mark on the fuselage of the enormou>[...]

Klyde Morris (09.24.18)

Klyde Makes His Apologies To Mr. Lindbergh... FMI: www.klydemorris.com>[...]

Aero-News: Quote of the Day (09.24.18)

"The FAA and industry are working together to prevent Loss of Control (LOC) accidents and save lives. You can help make a difference by joining our #Fly Safe campaign. Every month >[...]

OOPS! Cathay Pacific Mispaints New 777

Social Media Has A Bit Of Fun At The Airline's Expense When Cathay Pacific's lates 777 was delivered, there was a glaring error in the plane's livery. "Pacific" was spelled without>[...]

AMA Drone Report 09.20.18: Section 336 Update, LAANC Course, Drones In Florence

Also: FAA Reauthorization Stalled, Golf Course Drone Delivery, eBee X Fixed-Wing, Drone Locates Missing Woman AMA president Rich Hanson has sent letters to the House and Senate, re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC