NASA Issues Proposal Request For Ares I Avionics Unit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 08, 2007

NASA Issues Proposal Request For Ares I Avionics Unit

Raytheon Already Has Hat In The Ring

NASA has issued a request for proposal Wednesday for key guidance, navigation and control hardware for the new Ares I crew launch vehicle. The upper stage instrument unit avionics is to be used during the Ares I ascent.

Proposals are due by July 30 and a selection expected in November. The contract will be awarded through a full and open competition, according NASA.

The avionics unit will provide guidance, navigation and control for the entire launch vehicle as it transports the Orion crew exploration vehicle to low Earth orbit.

The request for proposal calls for the winning contractor to work closely with the NASA design team to provide engineering support during the design phase. It also specifies that the contractor will produce avionics for the development and flight program and will provide sustained engineering support for the upper stage avionics system through 2016.

As they say, the early bird gets the worm. Raytheon Company told ANN last month the company planned to submit a proposal as the prime contractor to partner with NASA on the development and manufacture of the avionics unit for the Crew Launch Vehicle that will carry astronauts into orbit when the Space Shuttle is retired in 2010.

"Raytheon is uniquely positioned to support the NASA design team at Marshall Space Flight Center on a program that is as bold and innovative as the Ares I Crew Launch Vehicle," said Louise Francesconi, Raytheon Missile Systems president. "Our technical expertise, innovative solutions, mature manufacturing processes and more than 40 years of space experience make us the right partner for NASA."

FMI: www.exploration.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC