Gulfstream Completes First 'Virtual' G650 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 03, 2009

Gulfstream Completes First 'Virtual' G650 Flight

Pilots 'Fly' Flagship Aircraft... Via Sim

Gulfstream Aerospace tells ANN it recently completed the first simulated flight of the company’s flagship jet, the state-of-the-art Gulfstream G650.  The event took place December 15 in the G650 Integration Test Facility (ITF) located at Gulfstream headquarters in Savannah.

Project Pilot Jake Howard and Chief Experimental Pilot John O'Meara conducted the first flight. A team of engineers and other pilots also had an opportunity to operate the controls during the real-time simulation.

The G650 ITF, which was developed by a team of Gulfstream engineers and technicians, comprises a full-scale cockpit with avionics, hardware and sensors.  It also includes a full-scale cabin mock-up with a galley.

To be as representative of the aircraft as possible, the G650 ITF uses final data design and maximum use of production hardware running in a closed-loop simulation. It utilizes the first nose, which was produced using new tools and processes in the recently built G650 manufacturing facility. The ITF enables all aircraft systems to be thoroughly evaluated and tested by engineers and pilots in a controlled lab environment well before the aircraft makes its maiden flight.

"I am delighted that development of the G650 is going as planned," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "This achievement demonstrates the successful integration of numerous cockpit systems, including those designed by Gulfstream and those provided by our suppliers. It reflects the effort and progress of a very talented team that's dedicated to the development of the G650."

Gulfstream announced the G650 on March 13, 2008. It offers the longest range, fastest speed and largest cabin in the company's fleet. It is capable of traveling 7,000 nautical miles at 0.85 Mach or 5,000 nautical miles at 0.90 Mach. The G650 is designed to offer a maximum operating speed of 0.925, which will make it the fastest civil aircraft flying.

Gulfstream expects to begin G650 customer deliveries in 2012. That development schedule projects Federal Aviation Administration (FAA) Type Certification and validation by the European Aviation Safety Authority (EASA) in 2011.

The first real flight of the G650 is scheduled for the second half of this year.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC