Boeing Submits A-10 Sustainment/Integration Contract Bid | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 05, 2009

Boeing Submits A-10 Sustainment/Integration Contract Bid

US Air Force Program Will Add New Life To Old Warthogs

Boeing submitted a proposal to the US Air Force this week to participate as an associate prime contractor in the projected $1.6 billion A-10 Thunderbolt Life-Cycle Program Support (TLPS) contract to support the sustainment of the A-10 Thunderbolt II weapon system and integration of current and future requirements.

"We are confident the Air Force will continue to recognize the resources and competencies that The Boeing Company brings to the warfighter," said Steve Waltman, director of Boeing Aircraft Sustainment & Maintenance, a subdivision of the company's Maintenance, Modifications & Upgrades division. "We are committed to the standard of excellence we have exhibited on the current A-10 Wing Replacement Program and, if selected, we will deliver the same outstanding level of customer satisfaction and performance on the TLPS contract."

Boeing won the $2 billion A-10 Wing Replacement Program contract in June 2007. The program includes engineering services and the manufacture of up to 242 wing sets for the Air Force's A-10 fleet. Boeing says that program is on schedule, with work underway on the 3-D models to provide the engineering foundation for current wing sustainment needs, design improvements to prevent cracking, and production of the enhanced wing sets.

As ANN reported, the Air Force grounded 127 of its A-10s last October, until inspections were conducted throughout the fleet for evidence of wing cracking.

"The Boeing solution for the A-10 Wing Replacement Program allows the A-10 fleet to fly for at least another 20 years, providing the close-air support our troops need," said Bill Moorefield, A-10 program manager for Boeing. "Our proposal for TLPS takes that one step further -- providing support for the aircraft fleet while ensuring relevance and viability through 2028 and beyond."

The Air Force will select up to three contractors to compete for individual task and delivery orders over the life of the contract. Work will include avionics, mechanical, structural, and propulsion system upgrade work and a program integration support task.

The A-10, also known as the Warthog, was first introduced into the Air Force inventory in 1976. The twin-engine aircraft provides close-air support of ground forces and employs a wide variety of conventional munitions, including general-purpose bombs. The simple, effective and survivable single-seat aircraft can be used against all ground targets, including tanks and other armored vehicles. The aircraft is currently supporting operations in Afghanistan and Iraq.

FMI: www.boeing.com/ids

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC