FAA Dedicates New Palm Springs, CA Control Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Sep 23, 2013

FAA Dedicates New Palm Springs, CA Control Tower

Total Project Cost Was About $25 Million

The FAA and local officials on Thursday dedicated a new, environmentally friendly airport traffic control tower at Palm Springs International Airport. The tower replaces a facility that served the airport since 1967.

The new tower is 150 feet tall – two-and-a-half times the height of the old tower – and provides air traffic controllers with better sight lines, as well as a more efficient work space. It sits on top of a 7,000 square-foot base building.

“This tower is part of our commitment to maintaining the world’s safest aviation system,” said FAA Administrator Michael Huerta. “Palm Springs is a vastly different airport than it was in 1967, and this new tower will give controllers better views of planes on the airfield and approaching the airport.”

The total project cost, including construction, electronics and equipment installation, was approximately $25 million. A $13.9 million American Recovery and Reinvestment Act grant paid for the construction, which began in June 2010.

The tower project includes a host of money-saving green features, including coated glass panels that reduce radiant heat inside the controller work area, decorative rock landscaping that requires no watering, and motion sensor-controlled lighting. Additionally, the contractor will soon start building a covered parking structure with solar panels on the roof that the FAA expects will produce a significant amount of the facility’s annual electrical needs when it’s completed in late 2014.

Palm Springs International Airport serves 10 major airlines. It had about 58,000 takeoffs and landings in 2012.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC