Parachute Failure Mars NASA's Second LDSD Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Jun 10, 2015

Parachute Failure Mars NASA's Second LDSD Test

Chute Did Not Fully Deploy, Data Being Analyzed

NASA’s Low-Density Supersonic Decelerator (LDSD) project completed its second flight test when the saucer-shaped craft splashed down safely Monday in the Pacific Ocean off the coast of the Hawaiian island of Kauai Monday.

NASA said in a news release that two experimental decelerator technologies – a supersonic inflatable aerodynamic decelerator and a supersonic parachute – were tested. The supersonic inflatable aerodynamic decelerator deployed and inflated. The supersonic parachute also deployed; however, it did not perform as expected. Data were obtained on the performance of both innovative braking technologies, and the teams are beginning to study the data.

NASAspaceflight.com reports that the test was still considered a success. The LDSD was carried to 120,000 feet by a large balloon and released. The four rocket motors designed to spin the disc to give it gyroscopic stability fired as expected, as did the main rocket motor which carried the disk to 180,000 feet. The  Supersonic Inflatable Aerodynamic Decelerator (SAID) deployed nominally, slowing the disk form Mach 3.8 to Mach 2.5.

But as with the last test, the parachute failed to fully deploy. While that was not so much of a concern for the first test, it was one of the major test parameters following a redesign of the parachute system.

NASA is still analyzing the data to determine its next steps in the program.

(Images provided by NASA)

FMI: www.nasa.gov/mission_pages/tdm/ldsd/index.html


Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC