Aero-News Network: The aviation and aerospace world's daily/real-time news and information service
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Hide/Show Archive Navigation.

All News

January 22, 2014

CAE Sets New Record For Full-Flight Simulator Sales

Forty-Three Sold Fiscal Year To Date, Company Says

CAE says it has set a new record for the sale of full-flight simulators (FFS) with 43 FFS already sold year to date in fiscal 2014. The latest contracts include the sale of five full-flight simulators -- one B787 simulator to Air Canada, one B737NG simulator to an undisclosed customer in North America as well as two A320 simulators and one B737NG simulator to an undisclosed customer in Asia.

Read More

Twenty-Three Fokker Aircraft Placed In 2013

Inventory Remains Steady, Fewer Placements Than In Previous Years

A total of twenty-three Fokker aircraft were placed with twelve existing and three new Fokker operators in 2013 by their respective aircraft sellers and lessors. These comprise twelve Fokker 50’s and eleven Fokker 100’s.

Read More

ATK Awarded Composite Components Contract For The Boeing Dreamliner

Will Produce Substructural Composite Components For The 787 Beginning Immediately

ATK has been selected by Boeing for a contract, beginning immediately, to produce substructural composite components for the Boeing 787 Dreamliner.

Read More

BAE Systems Produces 3D Printed Part For Use On BAe 146

Component Produced Using Additive Manufacturing Technology EASA Approved

BAE Systems Regional Aircraft has designed and achieved EASA Form 1 certification approval for an aircraft part for the BAe 146 regional jetliner using innovative new 3D printing (Additive Manufacture) technology. The part is a plastic window breather pipe used as a vent to stop condensation from forming on cabin windows.

Read More

Boeing, GECAS Announce Order For 20 737 MAXs, 20 Next-Generation 737s

GECAS Orders For 737 MAX Grow To 95

Boeing and GE Capital Aviation Services (GECAS), the commercial aircraft leasing and financing arm of General Electric, has place an order for 40 737s. The order, valued at $3.9 billion at list prices, consists of 20 737 MAX 8s and 20 Next-Generation 737-800s.

Read More

Bombardier Preps For Full Scale Structural Test On Advanced Carbon Fiber Wing

Moog Aerospace Test System Will Be Utilized In The Fatigue Testing

Moog Industrial Group has been selected by Bombardier Aerospace, Belfast to supply an aerospace test system to undertake a full-scale structural test on the CSeries aircraft advanced carbon fiber wing. The system will be used to carry out fatigue testing of the composite structures of the wing. This testing forms part of the CSeries aircraft certification test program.

Read More

Advertisement




Advertisement

Advertisement

Podcasts

AeroTwitter

© 2007 - 2024 Web Development & Design by Pauli Systems, LC