Northrup Grumman Lands $795 Million In Navy Contracts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.15.15

Airborne Hi-Def On YouTube

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.15.15

 

Thu, Aug 11, 2011

Northrup Grumman Lands $795 Million In Navy Contracts

Calls E-2D Hawkeye 'The Right Platform...At The Right Time'

Northrop Grumman Corporation says it has been awarded $795 million in contracts by the U.S. Navy for the E-2D Advanced Hawkeye Program.

Under a sole source, firm-fixed price $761 million contract, prime contractor Northrop Grumman will manufacture and deliver five low-rate initial production (LRIP), Lot 3, E-2D Advanced Hawkeye aircraft to the U.S. Navy. Also under this contract, are long lead materials for five LRIP, Lot 4, E-2D Advanced Hawkeyes.

Northrop Grumman also received a $34 million modification to a previously awarded contract for the procurement of one additional E-2D Advanced Hawkeye LRIP, Lot 2, aircraft.

Company VP Jim Culmo calls the awards significant program milestones, and adds, "The innovation Northrop Grumman applied to the design and development of the E-2D Advanced Hawkeye leverages experience gained from providing uncompromised airborne early warning and battle management command and control for more than 50 years. This affirms that the E-2D Advanced Hawkeye is the right platform providing the right capability at the right time."

To date, Northrop Grumman has delivered five E-2D aircraft to the Navy, one of which was delivered to the fleet and is currently used to conduct aircrew and maintenance training at Naval Air Station Norfolk in Virginia. An additional six aircraft are in various stages of manufacturing and pre-delivery flight test as the program moves toward full-rate production.

FMI: www.northropgrumman.com

Advertisement

More News

Airborne 05.20.15: HondaJet Update, Latitude Exceeds, Turbonormalized P210

Also: Airplane Swap Stymied, Oshkosh Veterans, Boeing Hiring, National Aviation Symposium, Airlines for America, Another Stolen Airplane, WAI's New Board Members The Honda Aircraft>[...]

FAA Issues Emergency AD For Avidyne

Avidyne IFDs Found To Have Displayed Incorrect Course Deviation Indication Information During GPS Approaches The latest Emergency AD to be issued by the FAA has involved the new ge>[...]

ANN's Daily Aero-Linx (05.21.15)

Association for Women in Aviation Maintenance This nonprofit organization was formed to champion women's professional growth and enrichment in the aviation maintenance fields.>[...]

ANN's Daily Aero-Term (05.21.15): Flat Rated

Propulsion engine capable of giving full thrust or power for take-off at an airfield well above S/L and/or at high ambient temperature (thus, probably derated at S/L).>[...]

Aero-News: Quote Of The Day (05.21.15)

“Communities of all sizes, in every corner of the country, are depending on you to retain your oversight authority in the areas of taxes and access, to ensure that the public>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC