EASA, FAA Approve GV/GIV/GIV-SP/G400/G300 Cockpit Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Sun, Jun 24, 2012

EASA, FAA Approve GV/GIV/GIV-SP/G400/G300 Cockpit Upgrade

Gulfstream Says PlaneDeck Enhances Aircraft’s Safety, Efficiency, Reliability

The FAA and EASA have both granted approval to Gulfstream to retrofit its GV, GIV, GIV-SP, G400 and G300 aircraft with the cockpit upgrade known as PlaneDeck.

The optional upgrade, an exclusive for Gulfstream operators, converts the primary flight display from cathode ray tube to liquid crystal. Gulfstream’s six-panel display configuration remains the same. Along with improved clarity of the displays, PlaneDeck offers operators enhanced safety, efficiency and reliability with the integration of XM graphical weather; electronic charts and maps, which will be certifiable as paperless; and video displays, accessible through all-new dual cursor controls. Minimal pilot training is necessary.

“This is great news for the more than 700 GV, GIV, GIV-SP, G300 and G400 operators worldwide,” said Mark Burns, president, Gulfstream Product Support. “PlaneDeck’s advanced technology offers many safety benefits and improves an aircraft’s efficiency and reliability.”

The PlaneDeck installation complements upcoming FAA NextGen requirements, such as the Future Air Navigation System 1/A data link, Wide Area Augmentation System-Localizer Performance with Vertical Guidance and Required Navigation Performance. According to the FAA, which projects increased business jet and airline travel in the next 20 years, the use of satellite-based technology will help reduce gridlock, in the air and at airports.

The installation of PlaneDeck on Gulfstream GV, GIV, GIV-SP, G400 and G300 aircraft has already begun. Installation time is 10 to 12 business days.

FMI: www.gulfstream.com

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC