Vega Rocket Ready For First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.29.16

Airborne 08.30.16

Airborne 08.31.16

Airborne 09.01.16

Airborne 08.26.16

Airborne Hi-Def On YouTube

Airborne 08.29.16

Airborne 08.30.16

Airborne 08.31.16

Airborne 09.01.16

Airborne 08.26.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

 

Fri, Jan 20, 2012

Vega Rocket Ready For First Flight

ESA's Completes Final Checks On New Launcher

Final checkout of Europe’s new Vega launcher was completed a week ago Friday, marking another milestone towards its maiden flight from Europe’s Spaceport in Kourou, French Guiana. The first Vega launch campaign began in November with the installation of the P80 first stage on the launch pad. The two solid-propellant second and third stages were added to the vehicle, followed by the AVUM – Attitude & Vernier Upper Module – liquid-propellant fourth stage. All four stages have undergone final acceptance, including the testing of the avionics, guidance, telemetry, propulsion, separation pyrotechnics and safety systems.

These steps culminated on 13 January with Vega’s ‘synthesis control checks’, where all systems were put into launch mode for the vehicle’s final acceptance. This included pressurising the AVUM propulsion systems that actuate the thruster valves. The rocket’s elements were switched on from the control bench to simulate the launch countdown. The onboard software then took over and simulated the different stages of a flight. The interfaces between the vehicle and the control bench were also tested. The test review confirmed that everything ran as expected and that the launcher is ready for flight.

In the next phase of launch preparations, the ‘upper composite’ – the fairing and payload – will be integrated, followed by final checkout of the fully assembled launcher and the countdown rehearsal. The first launch, VV01, is targeted for 9 February. It will carry nine satellites into orbit: the Italian space agency’s LARES and ALMASat-1, together with seven CubeSats from European universities. This mission aims to qualify the Vega launch system, including the vehicle, its launch infrastructure and operations, from the launch campaign to payload separation and disposal of the upper module.

Vega is designed to cope with a wide range of missions and payload configurations in order to respond to different market opportunities and provide great flexibility. In particular, it offers configurations able to handle payloads ranging from a single satellite up to one main satellite plus six microsatellites. Vega is compatible with payload masses ranging from 300 kg to 2500 kg, depending on the type and altitude of the orbit required by the customers. The benchmark is for 1500 kg into a 700 km-altitude polar orbit. (Image provided by ESA)


FMI: www.esa.int

Advertisement

More News

Airborne 08.30.16: Commercial UAS Takes-Off, SWA Engine Failure, MH370 Debris

Also: Humans-To-Mars, Burgess-Wright Model-F, Aero-Calendar, Sport CFI NPRM, Air Safety Forum, Stemme Tragedy, PowerEgg As we reported in our Monday edition of Airborne Unlimited, >[...]

Airborne 08.29.16: sUAS Rules Get REAL, Pilots To The Rescue, ISS Update

Also: AA MD-80s, A320 Birdstrike, SWA Picketed, Randy Babbitt, STEREO Mission, Prince Harry v Poachers, ANA Dreamliners August 29 is a big day as it relates to recreational and non>[...]

Airborne 08.30.16: Commercial UAS Takes-Off, SWA Engine Failure, MH370 Debris

Also: Humans-To-Mars, Burgess-Wright Model-F, Aero-Calendar, Sport CFI NPRM, Air Safety Forum, Stemme Tragedy, PowerEgg As we reported in our Monday edition of Airborne Unlimited, >[...]

ANN's Daily Aero-Linx (08.31.16)

General Aviation ADS-B Rebate Program Latest updates from the FAA concerning its efforts to help pilots meet the 2020 deadline for ADS-B Out equipage.>[...]

AD: RUAG Aerospace Services GmbH Airplanes

AD NUMBER: 2016-17-05 PRODUCT: RUAG Aerospace Services GmbH Models 228-100, 228-101, 228-200, 228-201, 228-202, and 228-212 airplanes.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC