First Flight For The Navy Version Of The JSF Goes Without A Hitch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Fri, Jun 25, 2010

First Flight For The Navy Version Of The JSF Goes Without A Hitch

First F135 Production Engine Also Installed In First Production Lightning II

The F-35C carrier variant of the Joint Strike Fighter recently flew for the first time, marking another milestone in the program. It was powered by a production-lot engine produced by Pratt & Whitney.

The engine maker also reports the installation of the first production F135 engine into a production F-35 aircraft. "It has been a tremendous year for the F135 engine as it continues its steady progress through conclusion of development testing and validation, and into full production and sustainment," said Bennett Croswell, Vice President of F135 and F119 Engine Programs.

The first F-35C flight, which lasted 57 minutes, was flown by Lockheed Martin Test Pilot Jeff Knowles and powered by an Initial Service Release (ISR) / production configured F135 engine. The Pratt & Whitney F135 Conventional Takeoff and Landing (CTOL) / Carrier Variant (CV) engine received ISR certification from the U.S. Governments in February indicating that the engine, with more than 17,600 test hours, has met all the ISR requirements for safety, reliability, durability and performance, and that it is now cleared for use in the field.

"The fact that this first F-35C flight was powered by a Pratt & Whitney ISR F135 engine is a clear demonstration that this engine is ready for use by our servicemen and women today," Croswell said.

Another recent F135 milestone achieved was installation of the first production configuration F135 propulsion system into a production F-35 aircraft.

"This is an achievement we celebrate with our teammates at the F-35 Joint Program Office and Lockheed Martin," said Warren Boley, President of Pratt & Whitney Military Engines. "Every day, with every milestone, the F135 propulsion system continues to demonstrate an unprecedented level of performance, maturity and dependability, and this achievement puts us one step closer to placing this game-changing aircraft into the hands of the U.S. military as well as those of our international partners."

FMI: www.pw.utc.com, www.lockheedmartin.com

Advertisement

More News

Aero-News: Quote Of The Day (09.21.14)

"The RCAF took the initiative to remove these functional, perfectly good parts and use them effectively. It was a sound decision, helping to ensure the long-term viability of the a>[...]

Enhanced F-35 Logistics Systems Delivered To Flight Test Locations

Integrates Preventative Maintenance, Flight Scheduling, And Mission Planning The 'next evolution' of the F-35 Lightning II's information technology backbone called the Autonomic Lo>[...]

Airbus Forecasts Strong Demand For Air Travel In The Middle East

Delivers First A380 To Qatar Airways Saying Airplane Is 'Ideal' For The Region Airbus has delivered Qatar Airways' first A380, and has used the occasion to tout the airplane as pla>[...]

NBAA Names 2014 Humanitarian Award Recipients

International Jet Aviation, Make-A-Wish Foundation, To Be Honored In Orlando The NBAA is pleased to announce that International Jet Aviation Services of Centennial, CO and the Make>[...]

NASA Seeks America's 'Best And Brightest' For Research Fellowships

Applications Period Open For Space Technology Grants NASA is seeking applications from U.S. graduate students for the agency's Space Technology Research Fellowships. The research g>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC